Receive the latest industry news, invitations to events and special offers here.

Thank you for subscribing

You will now be kept up-to-date with the latest industry news, invitations to events and special-offers.

Receive the latest industry news, invitations to events and special offers here.

Register to access content

If you already have an account please log in.

By registering my information with the Beacon Events I recognise that I may receive information and updates around other related mining and mining investment events managed by Beacon Events.

The content you are trying to access is for registered users only

Click here to register your account.

NOTE: You will need to register with the same email address that you used when registering for the event to receive access.

Already have an account? Click here to log in.

The content you are trying to access is for authorised users only

NOTE: You will need to have registered with the same email address that you used when registering for the event to receive access.

Please use a different account to access this content.

Maximizing Production With Dynamic Maintenance Planning And Scheduling

  • 25 November 2020

Following yesterday’s presentation at the International Mining and Resources Conference (IMARC) Online, we spoke with Dassault Systèmes, DELMIA Account Lead, Energy and Materials, Asia Pacific South, Michael Stockbridge and Sean Ashari, Senior Solution Consultant, to gain further insights on how to maximize production with dynamic maintenance planning and scheduling.

The Goal:

  • Return 1 Day to production
  • Reduce 1% on OPEX
  • Reduce the duration of shut window by 1%

Mining operations are complex, and require an extremely high level of planning, scheduling, coordination and reporting in order to ensure they run like clockwork and deliver on production targets. Improving performance and productivity in a mining operation is no small task.

One of the greatest barriers to improving sustainability and profitability in mining operations is operational inefficiency. Operational efficiency is not only about the quantity of material a mine processes; a sound maintenance schedule is crucial for optimum safety, reliability and productivity.

In order to perform maintenance works, a mine site needs to periodically shutdown. Regular maintenance is necessary in order to ensure a mining operation runs smoothly and to decrease risk of unplanned downtime if machinery is not properly maintained. However, every hour that a mining operation is idle translates into millions of dollars of lost potential revenue. Therefore, it is important to meticulously plan shutdowns for maximum safety, minimum disruption.

A single integrated decision support system can help efficiently plan and schedule maintenance mining operations. This means reducing down time due to maintenance activities, returning days to production and improving capacity utilization.

Dassault Systèmes DELMIA Quintiq Maintenance Planning Solutions for mining enable operations to model, plan and optimise their business from end to end. This means that mining operators can conduct concurrent comparative analysis of multiple what-if scenarios to ensure feasibility of planning and scheduling decisions. There is real-time notification of conflicts arising from planning and events enabling operators to maximise utilisation and reduce cost of under-utilised resources. 

Dassault Systèmes DELMIA Quntiq Maintenance Planning Solutions have grown out of leaner industries, allowing us to demonstrate improvement for mining operations. The applications have helped improve Eurotunnel's maintenance efficiency and customer service.

The Eurotunnel is a vital link between the United Kingdom and central Europe. The 50km-long Channel Tunnel consists of two running tunnels, each divided into 3 intervals, and a service tunnel for maintenance and safety access. With 38km of the tunnel undersea, it is the longest undersea tunnel ever built. It is also the most circulated railway in the world, with 400 trains per day in peak periods, running Eurotunnel passenger and truck shuttles, high-speed passenger trains and freight trains – that is one train every 3 minutes. Any unplanned downtime will have a significant impact on operations.

Using Dassault Systèmes applications, Eurotunnel is able to concentrate maintenance activities into just one night per week, freeing up capacity for commercial services. In addition, Eurotunnel is able to make preventative maintenance decisions up to three years in advance as well as swiftly respond to any disruptions on the day of operations, balancing tunnel maintenance requirements with service offers and customer satisfaction.

For more information on how to maximize production with integrated maintenance planning and scheduling, you can watch Michael’s presentation on Dynamic Maintenance Planning & Scheduling with the On Demand feature at IMARC Online, or catch up with Dassault Systèmes at their virtual exhibition booth, on now until the 27th of November.

 For further information please visit imarconline.com

Related Articles

Find Out More About

Stay updated

Subscribe to receive our weekly highlights and instant updates on new releases

Join us at our upcoming events

International Mining and Resources Conference (IMARC)

27 - 29 October 2026

ICC Sydney

Australia's largest mining event connecting global mining leaders with technology, finance and the future.

Opening times:

  • Tue,Tuesday, 27 October: 9:00am - 5:30pm
  • Wed,Wednesday, 28 October: 9:00am - 5:30pm
  • Thu,Thursday, 29 October: 9:00am - 4:30pm
International Mining and Resources Conference (IMARC)

12 - 14 October 2027

ICC Sydney

Australia's largest mining event connecting global mining leaders with technology, finance and the future.

Opening times:

  • Tue,Tuesday, 12 October: 9:00am - 5:30pm
  • Wed,Wednesday, 13 October: 9:00am - 5:30pm
  • Thu,Thursday, 14 October: 9:00am - 4:30pm
Mines and Money Online Connect

14 - 15 July 2026

Online

Where global mining capital meets opportunity

Opening times:

  • START: Tuesday, 14 July 2026, 8:00 AM (UTC+1)
  • END: Thursday, 16 July 2026, 8:00 AM (UTC+1)
Mines and Money @ IMARC

27 - 29 October 2026

ICC Sydney

Leveraging off the scale of Australia's largest mining event to bring an unrivalled network of thousands of investors to Sydney.

Opening times:

  • Tue,Tuesday, 27 October: 9:00am - 5:30pm
  • Wed,Wednesday, 28 October: 9:00am - 5:30pm
  • Thu,Thursday, 29 October: 9:00am - 4:30pm
Mines and Money @ IMARC

12 - 14 October 2027

ICC Sydney

Leveraging off the scale of Australia's largest mining event to bring an unrivalled network of thousands of investors to Sydney.

Opening times:

  • Tue,Tuesday, 12 October: 9:00am - 5:30pm
  • Wed,Wednesday, 13 October: 9:00am - 5:30pm
  • Thu,Thursday, 14 October: 9:00am - 4:30pm
Resourcing Tomorrow London

1 - 3 December 2026

Business Design Centre, London

Resourcing Tomorrow is the global forum where mining leaders unite to shape the future of the mining industry.

Opening times:

  • Tue,Tuesday, 01 December: 8:00am - 6:00pm
  • Wed,Wednesday, 02 December: 8:00am - 6:00pm
  • Thu,Thursday, 03 December: 8:00am - 4:30pm
Mines and Money @ RESOURCING TOMORROW

1 - 3 December 2026

Business Design Centre, London

Europe's largest mining investment event, connecting miners with money, and investors with opportunity.

Opening times:

  • Tue,Tuesday, 01 December: 8:00am - 6:00pm
  • Wed,Wednesday, 02 December: 8:00am - 6:00pm
  • Thu,Thursday, 03 December: 8:00am - 4:30pm
Resourcing Tomorrow Hong Kong

7 - 8 April 2027

Hong Kong

Investing in Metals and Minerals, Securing the Future.

Opening times:

  • Wed,Wednesday, 07 April: 9:00am - 6:00pm
  • Thu,Thursday, 08 April: 9:00am - 5:00pm